A canal of 7235 m length is to be constructed. out of this, 2356 m has been made. what length of the canal still needs to be constructed . please answer About the author Arya
Answer: This question is pretty simple…. Total length of canal to be constructed=7235m length of the canal which has been made=2356m Length of the canal to be constructed= Total length of the canal-length which has been made 7235-2356=4879m hence, the length of the canal to be constructed is 4879m Reply
Answer:
Canal is to be constructed=7235 m
Has been builder=2356m
so, left=7235-2356
=4879m
Answer:
This question is pretty simple….
Total length of canal to be constructed=7235m
length of the canal which has been made=2356m
Length of the canal to be constructed= Total length of the canal-length which has been made
7235-2356=4879m
hence, the length of the canal to be constructed is 4879m