A canal of 7235 m length is to be constructed. out of this, 2356 m has been made. what length of the canal still needs to be const

By Arya

A canal of 7235 m length is to be constructed. out of this, 2356 m has been made. what length of the canal still needs to be constructed .
please answer​​

About the author
Arya

2 thoughts on “A canal of 7235 m length is to be constructed. out of this, 2356 m has been made. what length of the canal still needs to be const”

  1. Answer:

    This question is pretty simple….

    Total length of canal to be constructed=7235m

    length of the canal which has been made=2356m

    Length of the canal to be constructed= Total length of the canal-length which has been made

    7235-2356=4879m

    hence, the length of the canal to be constructed is 4879m

    Reply

Leave a Reply to Hailey Cancel reply