days
9. Find the cost of 1.5 m cloth at the rate of * 2.20 per
meter-
(A) = 4
(B) 3.10
[tex]5[/tex]

days
9. Find the cost of 1.5 m cloth at the rate of * 2.20 per
meter-
(A) = 4
(B) 3.10
[tex]5[/tex]

About the author
Hadley

1 thought on “days<br />9. Find the cost of 1.5 m cloth at the rate of * 2.20 per<br />meter-<br />(A) = 4<br />(B) 3.10<br />[tex]5[/tex]<br />”

Leave a Reply to Madelyn Cancel reply