2) Neeraj can do a piece of work in 4 days and Aditya in 5 days. How long will they take to
do the same work, when working to

2) Neeraj can do a piece of work in 4 days and Aditya in 5 days. How long will they take to
do the same work, when working together?​

About the author
Isabella

2 thoughts on “2) Neeraj can do a piece of work in 4 days and Aditya in 5 days. How long will they take to<br />do the same work, when working to”

  1. Answer:

    Ab mai samjha ki tu kabhi merese love karti hi nahi thi isiliye tune aisa kiya

    BTW its your choice

    IDC

    Step-by-step explanation:

    Gravity, also called gravitation, in mechanics, the universal force of attraction acting between all matter. … On Earth all bodies have a weight, or downward force of gravity, proportional to their mass, which Earth’s mass exerts on them. Gravity is measured by the acceleration that it gives to freely falling objects.

    Reply
  2. Answer:

    Given A can do the work in 20 days and B can do it 15 days.

    Then work done by A in one day =

    20

    1

    And, work by B in one day =

    15

    1

    Then, the work done by A & B in one day =

    20

    1

    +

    15

    1

    =

    60

    7

    A & B done 6 days together then work done in A & B in 6 days =

    60

    7

    ×6=

    10

    7

    Then friction of work left =1−

    10

    7

    =

    10

    3

    Then B can do

    10

    3

    work =

    10

    3

    ×

    1

    15

    =

    2

    9

    =4

    2

    1

    days.

    Step-by-step explanation:

    do like this method ok