12 men and 15 women can finish a piece of work in 10 days and 21 women and 24 children can finish the same work in 15 days. in how

By Emma

12 men and 15 women can finish a piece of work in 10 days and 21 women and 24 children can finish the same work in 15 days. in how many days 1 men ,3 women and 2 children together finish the same work, at their double efficiency?

About the author
Emma

1 thought on “12 men and 15 women can finish a piece of work in 10 days and 21 women and 24 children can finish the same work in 15 days. in how”

  1. Answer:

    12 men can do the job in 10 days. That means one man can do 1/(12*10) or 1/120 of the job per day.

    15 women can do the job in 10 days. So one woman can do 1/(15*10) or 1/150 of the job per day.

    7 men and 10 women will do 7/120 + 10/150 of the job per day. 7/120=35/600 and 10/150=40/600. So 35/600 + 40/600 or 75/600 or 1/8 of the work will be done each day.

    It will take 8 days for the team to finish the job.