Rajeev has a square plot of side 300 m Find the cost of leveling it, if the rate of leveling is ₹ 1.32 per square meter.​

Rajeev has a square plot of side 300 m Find the cost of leveling it, if the rate of leveling is ₹ 1.32 per square meter.​

About the author
Reagan

2 thoughts on “Rajeev has a square plot of side 300 m Find the cost of leveling it, if the rate of leveling is ₹ 1.32 per square meter.​”

  1. Answer:

    ₹112500

    Step-by-step explanation:

    Let the side of the square a=300m

    Area of the square field =a² =300² =90000m²

    Cost of leveling the field = Area of the square field × cost per sq m

    =90000×1.25=1,12,500

    Thus, cost of leveling the square field is Rs. 1,12,500.

    Reply
  2. Answer:

    One side of a square plot is 300m

    Area of square plot = Side^2 = 300^2 = 90000 m^2Side2=3002=90000m2

    Cost of leveling 1 sq.m. = Rs.0.50

    Cost of leveling 90000 sq.m. =Rs.0.50 \times 90000Rs.0.50×90000

    = Rs.45000

    Hence the cost of levelling it is Rs.45000

    Reply

Leave a Comment