A can do a piece of work in 9 days, B is 50% more efficient than A . In how many days the same piece of work can be done if they w

A can do a piece of work in 9 days, B is 50% more efficient than A . In how many days the same piece of work can be done if they work together.

1-3.6 days
2-3 days
3-5/18 days
4-None​

About the author
Amelia

2 thoughts on “A can do a piece of work in 9 days, B is 50% more efficient than A . In how many days the same piece of work can be done if they w”

  1. Answer:

    a can do that work in 9 days

    In 1 day work done by a = 1/9

    then b can do that work in 6to 7 days

    In 1 day work done by b = 1/6

    if both work then work done in one day =1/9 + 1/6

    =6/18 = 1/3

    so 9 work will be done in

    3 days answer

    Reply