9 man can complete the electrical fitting in a building in 6 days. How many days will 27 men take to do the job? About the author Harper
Answer: 2 days. Step-by-Step Explanation: → 9 men can complete the electric fitting in a building in 6 days. Reply
Answer: The correct answer is 2 days Step-by-step explanation: 9 men can do in 6days 1 men do in = 6 × 9 so 27men don in = 54/27 = 2days Reply
Answer:
2 days. Step-by-Step Explanation: → 9 men can complete the electric fitting in a building in 6 days.
Answer:
The correct answer is 2 days
Step-by-step explanation:
9 men can do in 6days
1 men do in = 6 × 9
so 27men don in = 54/27
= 2days